Skip to main content

M783 Electronic Point Detonating/ Delay Fuze for Mortars

Key Features

  • Provides combat units with a reliable and advanced next-generation electronic PD/delay fuze for 60/81/120 mm mortars
  • Replaces the M935 and M745 fuzes
  • Provides combat units of all services with a “train as you fight” PD/delay fuze in conjunction with the M734A1 multi-option fuze for mortars (MOFM)
  • Incorporates two environmental safety features; eliminates need for safety pull pin
  • MIL-STD-1316, -331 and -333 compliant (STANAG 4187, 4157 and 2916)
  • Type classified on U.S. and NATO-standard 60 mm HE, 81 mm HE and 120 mm HE cartridges

Resources

  • M783 Electronic Point Detonating/ Delay Fuze for Mortars Data Sheet

    M783 Electronic Point Detonating/ Delay Fuze for Mortars Data Sheet

Related News

Green Wolf syncs with other launched effects and ground vehicles via digital lines

Press release | 07. 16. 2026

L3Harris and Shield AI Complete Autonomous Electronic Warfare Flight Test

L3Harris Technologies and Shield AI have completed the first flight test of the electromagnetic battle management ecosystem known as Distributed Spectrum Collaboration and Operations (DiSCO™) with Shield AI’s Hivemind mission-autonomy software.

Green Wolf syncs with other launched effects and ground vehicles via digital lines

Press release | 07. 16. 2026

L3Harris and Shield AI Complete Autonomous Electronic Warfare Flight Test

Combining launched effects with a proven mission aircraft, Red Wolf™ and Sky Warden™ expand operational reach and flexibility.

Editorial | 04. 27. 2026

L3Harris Red Wolf + SKY RAIDER II INTERNATIONAL: Unmatched Flexibility for Kinetic Strike, EW, ISR and Support Missions

Nexus Background Stealth

Press release | 04. 29. 2026

L3Harris Announces Confidential Submission of Draft Registration Statement for Proposed Initial Public Offering of Missile Solutions Business

Combining launched effects with a proven mission aircraft, Red Wolf™ and Sky Warden™ expand operational reach and flexibility.

Editorial | 04. 10. 2026

L3Harris’ Red Wolf and SKY RAIDER II INTERNATIONAL Showcase Adaptability for Evolving Missions

Image Credit: NASA. Artist rendering of a space communications satellite in orbit, representative of the resilient, multi-band infrastructure supporting mission operations across multiple orbits and domains.

Editorial | 04. 08. 2026

From Earth to Mars: Resilient Communications Powering the Space Economy

Related Domains & Industries

Solutions that solve our customers' toughest challenges.
view all capabilities

Contact the M783 Electronic Point Detonating/ Delay Fuze Team

Contact Us